Responsive image
博碩士論文 etd-0906104-100135 詳細資訊
Title page for etd-0906104-100135
論文名稱
Title
以先進規劃排程系統解決供應鏈產銷協同問題之研究-以IC基板廠為例
The Research of Advanced Planning & Scheduling System for Solving Supply Chain Production & Sales Collaboration Problems - A Case Study of IC Substrate Plant
系所名稱
Department
畢業學年期
Year, semester
語文別
Language
學位類別
Degree
頁數
Number of pages
85
研究生
Author
指導教授
Advisor
召集委員
Convenor
口試委員
Advisory Committee
口試日期
Date of Exam
2004-07-29
繳交日期
Date of Submission
2004-09-06
關鍵字
Keywords
供應鏈、派工法則、生產排程、供應鏈管理、生產計劃、先進規劃排程
Advanced Planning and Scheduling, Dispatching, Production Plan, Dispatching Rule, Supply Chain, Supply Chain Management
統計
Statistics
本論文已被瀏覽 5853 次,被下載 0
The thesis/dissertation has been browsed 5853 times, has been downloaded 0 times.
中文摘要
在目前半導體產業對於產品需求的多變性之情況下,造成了整體供應鏈產銷失調的困境。一般企業所導入之MRP/ERP(Material Resource Planning/Enterprise Resource Planning)解決方案似乎無法滿足在產能規劃及生產排程上的需要。本個案研究中以”先進規劃排程系統(APS)”取代人工經驗排程以解決供應鏈產銷協同的問題。
本研究選擇國內一家IC(Intergrated Circuit)基板廠為對象,就個案公司所面臨外在的需求變化及內部的資源限制下進行產業問題分析,同時進行設備產能資料之收集,以及派工法則之建立等,提供一個APS(Advanced Planning & Scheduling)系統的解決方案,其中歷經系統模型參數之修正過程,完成了達交查詢,投料計劃及出貨計劃,生產機台排程,what-if決策支援等系統功能,最終達成該公司最大產能利用率及客戶訂單滿足之目的。
APS建模是確保系統可用及有效的過程,在本研究中提出APS建模過程中的步驟與方法,在經由研究個案的實證,提供了相關企業導入APS實際的建議。
Abstract
Semiconduct industry is facing the various supply chain uncertainty problems at present. MRP/ERP (Material Resource Planning/Enterprise Resource Planning) solution can’t satidfy the requirement of production planning and scheduling for the enterprise.
In this research,on APS (Advanced Planning & Scheduling) system was proposed for an IC (Intergrated Circuit) substrate industry to replace manual planning process and to solve the resource constraint problems of production.
Following topics was addressed :
目次 Table of Contents
1. 緒 論
1.1. 研究背景
1.2. 研究動機與目的
1.3. 論文架構
2. 文獻探討
2.1. 供應鏈及供應鏈管理
2.1.1. 供應鏈的定義
2.1.2. 供應鏈管理
2.1.3. 供應鏈運作參考模型
2.1.4. 產銷協調
2.1.5. 供應鏈績效評量
2.2. APS系統觀念及技術
2.2.1. 先進規劃排程系統
2.2.2. 限制理論
2.2.3. 派工法則
2.2.4. ERP與APS之比較
2.3. 半導體IC基板產業供應鏈分析
2.3.1. 半導體供應鏈
2.3.2. IC基板簡介
2.3.3. IC基板市場
2.3.4. IC基板製作流程與成品
3. 研究方法
3.1. 個案研究分析
3.2. 個案公司選擇
3.3. 研究資料收集
3.4. 研究範圍
3.5. 研究步驟
3.6. 研究限制
4. 個案討論與分析
4.1. 個案公司簡介
4.1.1. 公司發展沿革
4.1.2. 公司業務型態
4.1.3. 個案產業在供應鏈所面臨問題與對策
4.1.4. 製造時間與需求預測
4.1.5. 生產線瓶頸製程
4.2. 供應鏈產銷協同問題之解決方案
4.2.1. 訂單滿足作業流程
4.2.2. 過去供應鏈流程
4.2.3. 供應鏈流程改善
4.2.4. APS專案的主要目的與導入範圍
4.2.5. APS專案的實施
4.3. APS系統的執行
4.3.1. APS系統之執行步驟
4.3.2. APS之需求來源
4.3.3. APS之製令規劃
4.3.4. APS之訂單分配
4.3.5. APS系統的建模
4.3.6. APS的排程法則
4.3.7. APS排程法則之順序
4.3.8. APS經濟批量連批法則
4.3.9. APS防饑餓法則
4.3.10. APS產品群組時間限制法則
4.4. APS面臨問題與資料驗證
4.4.1. APS需求面問題
4.4.2. APS資料面問題
4.4.3. 影響APS排程的因素
4.4.4. APS資料驗證
4.4.5. APS系統驗收條件
4.4.6. APS實施成效評量
5. 結論與建議
5.1. 研究結論
5.2. 研究建議
參考文獻
參考文獻 References
1. Andy Ferrar,Advanced Planning and Scheduling in the Online World – APS and B2B,2001.
2. Apsindight,APS and the Theory of constrain,ASP insight Issue 6,2001.
3. Apsinsight,MRP vs. APS – The difference is in the Detail,ASP insight Issue 9,2002.
4. Apsinsight,APS – A Case Study for Implementation,ASP insight Issue 21,2003.
5. Brendan McGettrick,Richard Sewell,Claire Sivills,Advanced Planning & Scheduling and Supply Chain Management,2000.
6. Chopra,Sunil and Peter Meindl,Supply Chain Management-Strategy,Planning and Operation,2001.
7. Conger,S.,Use the Information Technologies for Inter-Unit Coordination: A Case Study,Proceedings of the 12th International Conference on Information System,1987.
8. Deane,R.H.,Manufacturing and Marketing Interdependence in the New Venture Firm: An Empirical Study, Journal of Operations Management,1991.
9. Donald E,Shobrys,Douglas C. White,Planning Scheduling and Control System : Why Cannot They Work Together,Elsevier,2001.
10. Ellram,L.M.,Supply Chain Management: The Industrial Organization Perspective. Internationl Journal of Physical Distribution and Logistics Management,1991.
11. Ganishan,R.&T.P.Harrison,An Introduction of Supply Chain Management,1995.
12. Giinther Kruse,Opportunities in APS – a Broader View,2000.
13. Goldratt,E.M.,Thery of Constraints,North River Press,1990.
14. Goldratt,E.M.,The Goal,North River Press,1992.
15. Gunther Kruse,Advanced Planning & Scheduling : Beyond MRPII,scope.ltd@virgin.net
16. Inman,R.A.and Hubler,J.H.,Certify the Process,Not Just the Product,Production and Inventory Management Jounal,1992.
17. Ju-Kau Chen,Allan Chen,ATS Advances Planning & Scheduling System,IEEE,2002.
18. Jom Errington,Advanced Planning & Scheduling (APS) – A Powerful Emerging Technology,The Institution of Electrical Engineers,1997.
19. Kalakota,R.and Robinson,M.,e-Business Roadmap for Success,Addison Wesley,Wokingham,England,1999.
20. Konojnendijk,P.A.,Dependent and Conflict between Production and Sales,Industrial Marketing Management,1993.
21. Pearce,J.A. & Robinson,Jr.,Strategy Management: Formulation Implementation,1991.
22. Richard E.DeVor,Tsong-How Chang and John W.Sutherland,Statistical Quality Design and Control: Contemporary Concepts and Methods,1992.
23. Rho,Boo-Ho,Improving Interface Congruence between Manufacturing and Marketing in Industrial-Product Manufacturers,International Journal of Production Economics,1994.
24. St.John,C.H.& Hall,E.H.Jr.,The Interdependency Between Marketing and Manufacturing,Inductrial Macketing Management,1991.
25. St.John,C.H.,Marketing and Manufacturing Agreement on Goals and Planned Actions,Human Relations,1991.
26. Young Hae Lee,Chan Seok Jeong,Chiung Moon,Advanced Planning and Scheduling with outsourcing in manufacturing Supply Chain,Computers and Industrail Engineering,2002.
27. IBC台灣工銀綜合研究所,IC載板產業概況,2003.
28. 哈建宇,先進覆晶封裝製程興起-設備廠商競逐市場版圖,新電子科技雜誌,2003.
29. 周以琪,永續經營發展台灣IC載板產業,工研院ITRI,2003.
30. ITIS經濟部技術處,封裝帶動國內IC載板產業發展,2004.
31. 尚榮安 譯,個案研究法,旭昇圖書,2001.
32. 蔡宏明 譯,從供應鏈看管理,梅霖文化,2004.
33. 賴宣名,全球供應鏈管理,遠擎管理顧問,2002.
34. 盧舜年,鄒坤霖,供應鏈管理的第一本書,商周出版,2002.
35. 王立志,系統化運籌與供應鏈管理,滄海書局,1999.
36. 王立志,供應鏈實戰手冊-應用APS跨越MRP鴻溝,鼎誠資訊,2003
37. 林子灃,先進規劃排程決策支援系統之研究-以塑膠射出成型業為例,中山大學資訊管理研究所碩士論文,2003.
38. 劉其昌,晶圓批量異常等待時間為導向之派工法則,交通大學工業工程與管理研究所碩士論文,2002.
39. 周煜智,晶圓製造廠多工單等級之生產活動控制系統設計,交通大學工業工程與管理研究所碩士論文,2000.
40. 鄧雅元,先進生產規劃與排程系統分析,台灣大學工業工程研究所碩士論文,2000.
41. 蔡與哲,運用先進規劃排程之概念建立多廠生產的資源分配與生產規劃模式,台灣大學商學研究所碩士論文,2000.
42. 陳紹文,SCM,APS和ERP,ChianLean,2002.
電子全文 Fulltext
本電子全文僅授權使用者為學術研究之目的,進行個人非營利性質之檢索、閱讀、列印。請遵守中華民國著作權法之相關規定,切勿任意重製、散佈、改作、轉貼、播送,以免觸法。
論文使用權限 Thesis access permission:校內校外均不公開 not available
開放時間 Available:
校內 Campus:永不公開 not available
校外 Off-campus:永不公開 not available

您的 IP(校外) 位址是 44.200.95.157
論文開放下載的時間是 校外不公開

Your IP address is 44.200.95.157
This thesis will be available to you on Indicate off-campus access is not available.

紙本論文 Printed copies
紙本論文的公開資訊在102學年度以後相對較為完整。如果需要查詢101學年度以前的紙本論文公開資訊,請聯繫圖資處紙本論文服務櫃台。如有不便之處敬請見諒。
開放時間 available 已公開 available

QR Code